DEC 2022 - CURRENT
Eraring Power Station Ash Dam Southern Embankment Stabilization Project
Menard Oceania Oty Ltd
Details of the project included:
Erosion and sediment control
Installation of silt Fence, Discharge pump, spillway, clean water diversion and Dirty water diversion drain
Excavations and transport of material
Levelling – Safety Threshold Buttress
Site Preparation and planning, Strip Topsoil to Ash, compaction testing, import bottom ash, batter slopes and finish levels
Safety Threshold Buttress Working Platform (Upper and Lower)
Site preparation and planning, place fill in 300mm loose layers, compact and test, batter slopes to specifications, finish levels, repeat for working platform including Proof roll with Watercart
Civil Drainage Works
Site Prep & Planning, Excavation Works using GPS, construction and installation of Inlet and outlet Structures Rock drains/Weir, Stilling Basins and stormpro pipe install (900mm), Geo Fabric Install and rock lining Shotcrete Drains and Concrete Works, clean water system connections