top of page
Product

Tailings dam's, operations,
and rehabilitation

  • Removal and placement of dried ash

  • Stockpiling

  • Ash Dry stacking

  • Final Design landforms

  • Bulk Earthworks

  • Piping and valving

  • Ash Slurry Dewatering and Decant Systems

  • Dust Suppression – Truck Misting Spray 
Systems

  • Capping and Combining for recycling

  • Revegetation

  • Reclamation

  • Rehabilitation

SNK has a large diverse team and a 
multitude of assets:

  • 30t & 40t Dump Trucks

  • D6, D7, D8 & D11 Dozers

  • Excavators - 13, 16, 21, 30, 36, 50 & 85 Tonne

  • 18 and 22M Long Reach Excavators

  • Excavator Attachments

  • 21t Amphibious Excavator with dredge

  • WA480 and WA500 Loaders and scales

  • Graders 12 and 14M

  • Compactors

  • Watercarts (various capacity and sizes)

  • Water pumps and more

The SNK Benefit

Tailings Dams storage facilities naturally evolve over their Lifecycle and can involve multiples dams or cells which require constant ongoing maintenance and physical management to ensure reclamation and recycling objectives are met. This requires adaptive thinking practices and collaboration between a skilled team that can make crucial decisions with the mutual understanding that safety is paramount SNK offers the resources and services for all types of Tailings Dams management and have the skilled operators, labourers, plant/equipment, knowledge and consistent open communication to put you at ease.



SNK’s project management team understand that these works are an integral part of the mining and energy sector and will continue to do so as it transitions to renewable energy sources in line with the evolving ecological and environmental landscape. Successful operation and management of this large-scale tailings dam requires constant robust monitoring of the structural integrity ,evaluation of techniques for economical and sustainable outcomes and utilisation of  environmental plans to ensure regulatory requirements are met.


We use Various customised remediation strategies utilising strengths and proven methodologies that are successful and productive to achieve the best results and outcomes on budget and on time.

What we offer

EPS is NSW Largest PowerStation contributing to over 25% of NSW power supply.

SNK Group are currently the principal Subcontractor Managing and operating the Eraring Power station Ash dam in Partnership with Origin energy and have had ownership of this contract since 2017.


bottom of page